Sharp Hog Farm Test

Untreated lagoon at Sharp Farm
Hog waste lagoon, 75x25 foot waste lagoon servicing the Brood Barn on the Sharp Farm in North Carolina. During the test the lagoon was accepting all the waste from the brood barn which housed 200 sows.
6 week photo of Sharp Hog Farm Lagoon
The lagoon was accepting all waste from the Brood Barn. When this picture was taken, this lagoon had been running the Reliant Model WQA Aeration System with Sewper Rx digestant for only 6 weeks. In less than 3 days following the start of this test, there was no odor emanating from this lagoon. In just 2 months 6”, or 12.5%, of the sludge in this lagoon had been eliminated.
Model WQA water
Two weeks into the Sharp hog lagoon test. Model WQA water mover and aerator.
Graph 1
2nd graph
Third graph
graph 4